天天激情天天干,久久国产一级毛片一区二区,国产tv精品,天天草夜夜骑,中国av免费看,亚洲免费av观看,国产一区高清在线观看

 首頁 > 技術(shù) > 技術(shù)文摘 > [英文]測試你的IVR-關(guān)鍵步驟

[英文]測試你的IVR-關(guān)鍵步驟

2011-01-26 00:00:00   作者:   來源:   評論:0 點擊:


An important piece of any project plan and development cycle should always be a formal testing process. It’s surprising how often we see this skipped over or skimped on. It’s important to not only test the call flow itself, including all the branches and options, but also unexpected inputs and error conditions, and finally load testing.
We see many IVR systems where the only testing done was a handful of test calls to verify the call flow. Some common issues that should be considered include:
1、What happens if the caller hangs up unexpectedly?

2、What about if the caller enters the wrong number of digits, or the wrong termination digit?

3、What happens if there are no digits entered, how many times does the system retry? If the retries fail, does the system gracefully end the call or transfer to an agent?

4、If the system is using ASR, how does it handle background noise or speakerphone calls?
6、Proper and thorough testing before putting the IVR system into production can really make the difference between a stable, smooth launch and unexpected outages and frustrated callers down the road.

CTI論壇報道

相關(guān)閱讀:

分享到: 收藏

專題